Two-Step Application Process

Step 1 Reservation Request

Required Documents for All Projects:

  1. Completed Reservation Request Form 2012 with signatures
  2. Copy of Executed Contract or Agreement for Installation (includes warranty language documentation)
  3. Equipment Specifications
  4. Proof of Utility Service: submit a copy of a recent electric or gas utility bill indicating the account number, meter number, site address and host customer name.
  5. 12-Month Electric Load Documentation: submit a copy of the previous 12 months of energy consumption including maximum demand and/or kWh consumption.
  6. Energy Efficiency Audit: the audit must have been performed during the past five years and must identify feasibility and payback periods of energy-efficiency measures.
  7. Proof of Adequate Renewable Fuel or Waste Energy Resource (applies to all technologies except AES if operating on a renewable fuel or waste energy): submit an engineering survey or study confirming the renewable fuel and the generating system's average capacity.
  8. Proposed monitoring plan (for projects 30kW and larger)
  9. Documentation verifying non-profit entity status (if applicable)
  10. Application Fee: equal to 1% of the requested incentive amount

Additional Documents for Conventional CHP and Fuel Cells:

  1. Minimum Operating Efficiency Calculations (if applicable):
    1. Waste Heat Utilization Documentation OR
    2. Minimum Electric Efficiency Calculation
    For residential projects, please fill in the Residential Waste Heat Utilization Worksheet 2012. For commercial projects, please fill in the Commercial Waste Heat Utilization Worksheet 2012.
  2. Copy of Completed Air Pollution Permit Application (if applicable)
  3. Fuel Cleanup Equipment Purchase Order (On-site, renewable fuel projects only. Nominated biogas projects exempt)
  4. Renewable Fuel Affidavit (On-site, renewable fuel projects only.)
  5. Waste Gas Fuel Affidavit (waste gas projects only)

Additional Documents for Conventional CHP:

  1. Proof of Power Factor Eligibility
  2. Proof of NOx Emissions Qualifications (Non-renewable fuel projects only):
    1. Minimum 60% System Efficiency Calculation
    2. Emissions Credits Calculation (if applicable)
  3. Proof of Adequate Waste Gas Fuel (Waste-gas fuel projects only): submit an engineering survey or study confirming that there is adequate on-site waste gas fuel.

Additional Documents for Directed Biogas Projects:

  1. Copy of Executed Renewable Fuel Contract
  2. Forecasted Fuel Consumption
  3. Gas Injection Qualification
  4. Directed Biogas Attestation Letter - System Owner
  5. Directed Biogas Attestation Letter - Fuel Supplier

Download and complete the Reservation Request Form and email or mail it with all required attachments and the application fee to the address provided on the left.

Step 2 Incentive Claim

Required Documents for All Projects:

  1. Completed Incentive Claim Form 2012 with signatures
  2. Proof of Authorization to Interconnect
  3. Final Project Cost Breakdown Worksheet
  4. Project Cost Affidavit 2012
  5. Final Building Permit Inspection Report
  6. Substantiation of Load (New Construction/Expanded Load Only)
  7. Revised Sizing Calculations (if applicable)
  8. Performance Data Provider Documentation (for projects 30kW and larger)
  9. Final Monitoring Schematic (for projects 30kW and larger)
  10. Payment reassignment form (if applicable)

    Additional Documents for Conventional CHP and Fuel Cells:

    1. Revised Minimum Operating Efficiency Calculations (if applicable):
      1. Waste Heat Utilization Documentation OR
      2. Minimum Electric Efficiency Calculation
      For residential projects, please fill in the Residential Waste Heat Utilization Worksheet 2012. For commercial projects, please fill in the Commercial Waste Heat Utilization Worksheet 2012.
    2. Final Air Permit Documentation (if applicable) (nominated biogas projects exempt)
    3. Final Fuel Cleanup Skid Cost Documentation (on-site renewable fuel only, nominated biogas projects exempt)
    4. Substantiation of Renewable Fuel Resource (on-site renewable fuel only)
    5. Maintenance coordination letter (for CHP projects over 200 kW only)

    Additional Documents for Directed Biogas Projects:

    1. Supplier Renewable Fuel Documentation
    2. Proof of Renewable Fuel Contract Commencement
    3. Renewable Fuel Metering Specifications

    Download and complete the ICF form and email or mail it with all required attachments to the address provided on the left.

     

    CCSE Calendar

    Green Workshops & Events
    calendar view | list view