Please visit the SGIP Program Metrics page for the current incentive rates, current available funds and step opening dates for all budget categories.

Three-Step Application Process

Non-residential projects ≥ 10 kW

The SGIP releases new forms as needed, and required forms vary by Program Administrator. The document links below are applicable only for projects requesting an incentive reservation for the current program year. If you applied in program years 2011through 2016, click here to download the documents.

Required documents for all projects
  1. Log in to your account at www.selfgenca.com and complete the online Reservation Request Form.
  2. Application fee: Equal to 5% of the requested incentive amount, made payable to Center for Sustainable Energy and mailed to the address listed at the bottom of this page.
  3. Proposed manufacturer equipment specifications and applicable safety certifications. The Energy Storage Sizing Worksheet is now available for download to help you determine your storage system's size.
  4. Proof of utility service: Submit a complete copy of the customer's most recent electric utility bill.
  5. Completed 3rd Party Letter of Authorization to Receive Customer Information.
  6. 12-month electric load documentation: Submit a copy of the previous 12 months of energy consumption from the utility including maximum demand.
  7. Preliminary monitoring plan (for generation projects ≥ 30 kW).
  8. Proposed monitoring plan (for energy storage projects ≥ 30 kW or paired with on-site renewables). The  Proposed Monitoring Plan Checklist and Energy Storage Preliminary Monitoring Plan Template are now available for download.
Additional documents for thermal energy storage projects
Additional documents for renewable fuel, waste energy & waste gas projects
  1. Proof of adequate renewable fuel or waste energy resource (applies to all technologies except AES if operating on a renewable fuel or waste energy): Submit an engineering survey or study confirming adequate renewable fuel and the generating system's average capacity
  2. Forecasted fuel consumption (directed biogas projects only)
Additional documents for for nonrenewable fuel projects
  1. Minimum operating efficiency worksheet w/backup documentation
    For residential projects, fill in the Residential Minimum Operating Efficiency Calculations Worksheet. For commercial projects, fill in the Commercial Minimum Operating Efficiency Calculations Worksheet .
Complete the Reservation Request Form through the online application portal at www.selfgenca.com.

*Public entities are required to submit a copy of the Request for Proposal (RFP) within 90 days of the date of conditional reservation. All other PPM materials are due within 240 days of the date of conditional reservation.

Required documents for all projects
  1. Log in to your account at www.selfgenca.com and complete the Proof of Project Milestone Form
  2. Copy of executed contract or agreement for installation (includes warranty documentation)
  3. Results of an energy efficiency audit performed during the past 5 years. Audits may be performed by a Program Administrator, your utility or a qualified vendor/consultant. If you are interested in having CSE perform your SGIP audit please contact Jeremy Del Real at Jeremy.delreal@energycenter.org
  4. Proposed monitoring plan (for generation projects ≥ 30 kW)
  5. Substantiation of load (new construction/expanded load only)
Additional documents for renewable fuel projects
  1. Copy of executed renewable fuel contract (directed biogas only)
  2. Renewable Fuel Attestation Letter  - system owner & fuel supplier (Directed Biogas Only)
  3. Renewable Fuel Affidavit (on-site renewable fuel only)
  4. Fuel clean-up equipment purchase order (on-site renewable fuel only)
Additional documents for waste gas projects
Complete the Proof of Project Milestone Form through the online application portal at www.selfgenca.com.
Required documents for all projects
  1. Log in to your account at www.selfgenca.com and complete the Incentive Claim Form
  2. Proof of authorization to interconnect
  3. Final Project Cost Affidavit and Breakdown Worksheet
  4. Building permit inspection report
  5. Substantiation of load (new construction/expanded load only)
  6. Final monitoring schematic (for projects ≥ 30 kW or paired with on-site renewables)
Additional documents for CHP and fuel cells
  1. Final air permit documentation (if applicable)
  2. Planned Maintenance Coordination Letter (for CHP projects 200 kW and greater only)
Additional documents for renewable fuel & waste energy projects
  1. Renewable fuel documentation/proof of contract commencement (directed biogas only)
  2. Renewable fuel metering specifications (directed biogas only)
  3. Substantiation of fuel clean-up skid cost (on-site renewable only)
  4. Substantiation of renewable resource (on-site renewable & waste energy only)
Complete the Incentive Claim Form through the online application portal at www.selfgenca.com.

Download the current Self-Generation Incentive Program Handbook

Application fees for projects in SDG&E territory must be made payable to Center for Sustainable and mailed to:

Center for Sustainable Energy
Self-Generation Incentive Program
9325 Sky Park Court, Ste. 100
San Diego, CA 92123